Skip to main content

Dry bulk conveying news

 
 
 

Conveyor case study: Flémalle, Belgium

A coal-fired power plant was once in operation in the Belgian town of Flémalle. The coal residues are landfilled on a fly ash stockpile. Now, the stockpile is to be emptied and the terrain transformed into a nature reserve.

 
 

CSL’s MV Cedarglen sets sail on final journey

The bulk carrier ‘Eda’, formerly known as ‘Cedarglen’, departed the Port of Montreal for the last time on 21 July 2019, bound for an eco-friendly recycling yard in Turkey.