Bedeschi eco-hoppers shipped to Houston Port
Published by Stephanie Roker,
Editor
Dry Bulk,
In the morning of 13 November, two Bedeschi eco-hoppers were shipped to Houston Port.
The eco-hoppers were fully assembled in Chioggia, near Venice, and are set to arrive fully-erected to the US.
Bedeschi eco-hoppers are equipped with pulse-jet bag filter with high filtration engineering and less compressed air consumption; an economical and flexible solution to satisfy the highest environmental standards.
Read the article online at: https://www.drybulkmagazine.com/shipping/14112018/bedeschi-eco-hoppers-shipped-to-houston-port/
You might also like
Seawing automated kite system to be installed on the CORONA CITRUS
Kawasaki Kisen Kaisha, Ltd. and Electric Power Development Co., Ltd. have decided to install the “Seawing,” an automated kite system using wind power, on CORONA CITRUS, an 88 000 DWT-type special coal carrier for J-POWER.