Flexible screw conveyor available with Flexicon’s Quick-Ship Programme
Published by Stephanie Roker,
Editor
Dry Bulk,
Flexible screw conveyors in popular sizes are now available for shipment in two to five days as ready-to-assemble packages with Flexicon’s Quick-Ship Programme, the company announced.
Conveyor tubes and screws offered through the programme are supplied in any length from 3 - 12 m, in diameters from 67 - 115 mm OD.
Also included as standard are a stainless steel floor hopper, 45° or 90° discharge adapter, TEFC or wash-down duty motor, and water-resistant control panel.
All product contact surfaces are of stainless steel with the exception of the polymer conveyor tube. Non-product contact surfaces are of carbon steel construction with durable industrial finish.
Stainless steel screws are supplied in a range of geometries matched to the material being conveyed.
Options include a hopper flow promotion device, hopper cover with unflanged inlet port, hopper screen and low level sensor.
The conveyors can transport a broad range of bulk materials from large pellets to sub-micron powders, including friable products, abrasives and materials prone to pack, cake, bind or smear, with no separation of blends. Depending on screw geometry selected, material can be conveyed at any angle from horizontal to vertical, in a straight or curved path, through small holes in walls or ceilings.
The screw is driven beyond the point at which material exits the discharge housing, preventing material contact with seals and related issues of bearing failure and product contamination.
The inner screw can be removed through a lower end cap for wash down and inspection, and the conveyor tube flushed with water, steam or cleaning solution.
Read the article online at: https://www.drybulkmagazine.com/product-news/12112018/flexible-screw-conveyor-available-with-flexicons-quick-ship-programme/
You might also like
Diana Shipping Inc. announces direct continuation of time charter contract for m/v Phaidra with Aquavita
The new charter period is expected to commence on October 11, 2024.