Skip to main content

Windmill blades transported by Roll-Lift USA

Published by , Editor
Dry Bulk,


Roll-Lift USA revealed it has transported the first 67 m windmill blades that are set to arrive in the United States.

Windmill blades transported by Roll-Lift USA

In order to transport these Vestas blades engineered modifications were made to the company’s 48 m Nooteboom trailers. These blades were transported from shipside to place of rest at the Industrial terminal, and they will eventually be transported to rail at the Greensport terminal for shipment to Pueblo Colorado.

Read the article online at: https://www.drybulkmagazine.com/shipping/02082018/windmill-blades-transported-by-roll-lift-usa/

You might also like

Golden Ocean announces merger with CMB.Tech

The Term Sheet has been unanimously approved by Golden Ocean’s Board of Directors, including its special transaction committee composed of disinterested directors, and by CMB.TECH’s Supervisory Board.

 
 

Embed article link: (copy the HTML code below):