Windmill blades transported by Roll-Lift USA
Published by Stephanie Roker,
Editor
Dry Bulk,
Roll-Lift USA revealed it has transported the first 67 m windmill blades that are set to arrive in the United States.
In order to transport these Vestas blades engineered modifications were made to the company’s 48 m Nooteboom trailers. These blades were transported from shipside to place of rest at the Industrial terminal, and they will eventually be transported to rail at the Greensport terminal for shipment to Pueblo Colorado.
Read the article online at: https://www.drybulkmagazine.com/shipping/02082018/windmill-blades-transported-by-roll-lift-usa/
You might also like
Pyxis Tankers announces loan commitment for potential fleet expansion
Pyxis Tankers has announced it has signed a commitment letter for a loan of up to US$45 million for the potential acquisition of dry bulk carriers.