Windmill blades transported by Roll-Lift USA
Published by Stephanie Roker,
Editor
Dry Bulk,
Roll-Lift USA revealed it has transported the first 67 m windmill blades that are set to arrive in the United States.
In order to transport these Vestas blades engineered modifications were made to the company’s 48 m Nooteboom trailers. These blades were transported from shipside to place of rest at the Industrial terminal, and they will eventually be transported to rail at the Greensport terminal for shipment to Pueblo Colorado.
Read the article online at: https://www.drybulkmagazine.com/shipping/02082018/windmill-blades-transported-by-roll-lift-usa/
You might also like
Associated Terminals commissions two cranes from Liebherr
Built on modified 250 in. x 72 in. platforms, the newly commissioned crane barges are engineered for high-capacity bulk handling in the demanding conditions of inland waterways.