Enviva has awarded Bedeschi the materials handling and shiploading equipment for their new operation plant that is under construction in Pascagoula, Mississippi (USA).
The supply includes a new A-frame type shiploader, very similar to the one installed at Voestalpine in Corpus Christi (Texas), and the conveying system for woodchips from the rail unloading system to the process and to the port where the material feeds the shiploader trough a conveyor and a tripper system.
The overall capacity of the system is for 1600 tph on woodchips.
Read the article online at: https://www.drybulkmagazine.com/material-handling/10062019/enviva-awards-materials-handling-and-shiploading-contract-to-bedeschi/
In this webinar KabelSchlepp will review and discuss the items needed to ensure that a cable track is properly selected and sized for the user’s application. How diameters and weights of the fill package effect cable track selection and how the jacket material of the fill package influences the cable track design. Register for free today »
CN and Teck Resources Limited has announced a long-term rail agreement for shipping of steelmaking coal from Teck’s four BC operations between Kamloops and Neptune Terminals, and other west coast ports.