New conditioner for bulk bags features laser safety curtain
Published by Stephanie Roker,
Editor
Dry Bulk,
A new BLOCK-BUSTER® Bulk Bag Conditioner from Flexicon Corporation features a laser safety curtain that automatically stops the system's hydraulic rams, scissor lift and turntable if the laser beam is obstructed, eliminating the need for safety-hinged doors and interlock switches for operator safety.
The conditioner loosens densely packed bulk solid materials in bulk bags by means of hydraulic rams with specially contoured end plates that press and release opposing sides of the bag. A hydraulically actuated, variable height scissor lift with accordion style dust skirt and turntable allows conditioning of the bag on all sides at all heights.
The number and pressure of hydraulic ram actuations, the height of the turntable, and the number of 90° rotations are user adjustable. The system controller and hydraulic pump can be mounted on the exterior of the frame or remotely.
The new conditioner is intended for bulk bags containing hygroscopic chemicals, certain types of spice blends, heat-sensitive products, and other materials prone to solidifying to the point at which pneumatically actuated flow promotion accessories integral to bulk bag dischargers are inefficient or completely ineffective.
Available as a standalone unit or integral component of a bulk bag discharger, the unit measures 2210 mm H x 3378 mm W x 1981 mm D, accommodates bulk bags of all popular sizes, and requires only an electrical power connection for operation.
The company also manufactures bulk bag dischargers, bulk bag fillers, flexible screw conveyors, pneumatic conveying systems, tubular cable conveyors, manual dumping stations, drum/box/container tippers, weigh batching systems, and automated plant-wide systems integrated with new or existing process equipment.
Read the article online at: https://www.drybulkmagazine.com/material-handling/01052018/new-conditioner-for-bulk-bags-features-laser-safety-curtain/
You might also like
UMAS study finds optimising port waiting times could reduce dry bulker emissions by 10%
The study finds that these ships spend between 4-6% of their operational time, around 15-22 days per year, waiting at anchor outside ports before being given a berth.