Transnet Port Terminals has advised that Port Elizabeth Bulk Ore Terminal (PEBOT) will shut to shipping between 4 and 10 July 2020.
The terminal is currently operating at 60% effective level mover the one berth with two day shifts and no night shift.
Read the article online at: https://www.drybulkmagazine.com/shipping/15062020/port-elizabeth-bulk-ore-terminal-shipping-to-temporarily-shut/