Port Elizabeth Bulk Ore Terminal shipping to temporarily shut
Published by Jessica Casey,
Editor
Dry Bulk,
Transnet Port Terminals has advised that Port Elizabeth Bulk Ore Terminal (PEBOT) will shut to shipping between 4 and 10 July 2020.
The terminal is currently operating at 60% effective level mover the one berth with two day shifts and no night shift.
Read the article online at: https://www.drybulkmagazine.com/shipping/15062020/port-elizabeth-bulk-ore-terminal-shipping-to-temporarily-shut/
You might also like
Port of Port Hedland increased iron ore exports in February 2026
Pilbara Ports delivered a total monthly throughput of 55.9 million t during February 2026, with 40 million t of iron ore exports from the Port of Port Hedland.