CD Cargo transports coal to Werndorf power plant
Published by Claire Cuddihy,
Assistant Editor
Dry Bulk,
On 1 April, shortly after 1 p.m., the complete train consisting of the CD Cargo Falls wagons loaded with coal for the local power plant, stopped at the Werndorf station in Styria.
At the head of this train was a pair of CD Cargo Vectrons - 383.001 and 008, which was assisted in part of the route by the banking engine 383.002. Coal trains should travel from Ostrava to Werndorf several times a week.
Read the article online at: https://www.drybulkmagazine.com/rail-barge/02042019/cd-cargo-to-supply-werndorf-power-plant/
You might also like
Ready to revolutionise the cement industry?
Join our sister publication, World Cement, in Lisbon, 10 – 13 March 2024, for their first in-person conference and exhibition: EnviroTech.
This exclusive knowledge and networking event will bring together cement producers, industry leaders, technical experts, analysts, and other stakeholders to discuss the latest technologies, processes, and policies being deployed at the forefront of the cement industry’s efforts to reduce its environmental footprint.
HES International concludes sale of German DHUG terminal to Stahl Holding Saar
HES International B.V. has concluded the sale of Dillinger Hafen-Umschlagsgesellschaft mbH. (hereafter DHUG) in the port of Saarlouis/ Dillingen in Germany to the German Stahl-Holding-Saar GmbH & Co. KGaA (hereafter SHS).