In the morning of 13 November, two Bedeschi eco-hoppers were shipped to Houston Port.
The eco-hoppers were fully assembled in Chioggia, near Venice, and are set to arrive fully-erected to the US.
Bedeschi eco-hoppers are equipped with pulse-jet bag filter with high filtration engineering and less compressed air consumption; an economical and flexible solution to satisfy the highest environmental standards.