Skip to main content

Port Elizabeth Bulk Ore Terminal shipping to temporarily shut

 

Published by
Dry Bulk,

Transnet Port Terminals has advised that Port Elizabeth Bulk Ore Terminal (PEBOT) will shut to shipping between 4 and 10 July 2020.

The terminal is currently operating at 60% effective level mover the one berth with two day shifts and no night shift.

 

This article has been tagged under the following:

Dry cargo shipping news Iron Ore news